Handrail OP3
SKU: OP3.
Unit: m
Delivery time: 1 nädal
Unit: m
Delivery time: 1 nädal
OP3 is a single inline handrail / midrail & kerbrail for disabled ramps under one metre (FFL) and midrail for extra protection.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Similar products
OP14 is a single Inline Handrail / Kerbrail For disabled ramps under one metre (FFL)
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP14.
, Delivery time: 1 nädal
OP22 is top rail / handrail bikeway barrier with offset top rail and handrail for level and rake.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP22.
, Delivery time: 1 nädal
OP25 is top rail / balustrade Infill bikeway barrier with offset top rail and balustrade infill for level and rake.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP25.
, Delivery time: 1 nädal
OP28 is a double offset handrail / on hob.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP28.
, Delivery time: 1 nädal
OP27 is a single offset handrail / midrail & kerbrail for disabled ramps under one metre (FFL) with offset and midrail for extra protection.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP27.
, Delivery time: 1 nädal
OP31 is twin double offset handrail.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP31.
, Delivery time: 1 nädal